Contrary to what you might expect, when developing complex devices like smart medical devices, it's entirely possible to have a clear overall understanding of each project phase, well before the project begins. A smart device integrates three key components: electronics, mechanics, and software. Managing the development of these components at the same time to build a working device that meets regulations and is ready for mass production is a challenging task, so having foresight benefits any project. In this article, Innokas experts Petri Kemppainen and Petri Jolma give a brief overview of the typical stages in developing these types of devices, with a short explanation of each stage.

Project specifications and identification of requirements 

The first step in developing a smart medical device is understanding its purpose, operating environment, and the needs of the end user. Think; what kind of problem does this solve? How can it be solved the most efficiently? The needs analysis forms the foundation for defining the functional and technical requirements of the device, which include performance, service life, reliability, and safety standards. One of the key aspects of this phase is locking in these requirements early on. Any changes or additions made later can easily lead to schedule delays and complications. Therefore, it's important to thoroughly specify all requirements from the beginning. In this phase, every safety-critical device must meet all necessary requirements. For medical devices, this includes planning the clinical evaluation to systematically assess safety and performance using clinical data. If the device has patient contact, its biocompatibility is also evaluated to ensure it does not cause adverse reactions. 

Concept design  

The concept design phase begins with brainstorming various options that integrate mechanics, electronics, and software. The most promising concepts are then selected, and preliminary plans are drawn up. These plans include the overall design of the device, component placement, and rough dimensions. Core functionality is prioritized first, around which the rest of the design is built. 

Detailed design 

In the detailed design phase, all mechanical parts are meticulously designed, including material selection, component joints, and assembly processes. The electronics design involves creating electrical circuits, placing components, and simulating to ensure their functionality. If software is required, this is the stage where embedded systems or control algorithms are developed. Close collaboration between the mechanical and electronics teams is essential to ensure that the components work together faultlessly. 



Prototype manufacturing

Prototypes are then manufactured based on detailed design. These prototypes undergo extensive testing to ensure that the device meets all specified requirements. This testing includes evaluating electrical properties, mechanical resistance, temperature tolerance, and safety. 



Iterative improvement 

Following prototype testing, feedback is collected from various evaluations, including user tests. This feedback is used to refine the designs, making necessary adjustments to improve the device before moving to the final stages.



Final design, validation and verification  

This phase includes both validation and verification of the final design. The main difference between the two is that validation is focused on ensuring that the device meets the needs and requirements of its intended users and the intended use environment, whereas verification is focused on ensuring that the device meets its specified design requirements. 

The product design is then finalized, with detailed manufacturing drawings and parts lists created to guide production. The quality assurance (QA) team, having been involved from the beginning, helps ensure a smooth transition to this stage.



Manufacturing and assembly  

Preparation for manufacturing includes setting up production processes, selecting suppliers, and preparing assembly plans. Once everything is in place, production begins, starting with the initial production runs. Throughout this process, quality control is essential to ensure that the products meet all design and quality standards. 

Market introduction and maintenance  

The final phase involves preparing all necessary documentation, such as operating and maintenance instructions, and technical documentation. The product is then released to the market, where its performance is closely monitored. After-market services such as support and maintenance are provided by the responsible manufacturer.

Partnering eases the efforts 

Collaborating on product design projects can greatly accelerate timelines and speed up time-to-market. Choosing the right team for partnering is also an important process. At Innokas, this cooperation extends to in-house production capabilities, particularly for prototypes, because the product development and manufacturing can closely work together. With Innokas' own circuit board typesetting and PCB assembly, production is both expedited and aligned closely with the design team’s vision. 

If you wish to learn more and discuss your own product development project, you can book a free meeting through this contact form. 

Experts interviewed for this article

petri_kemppainen_sq

Petri Kemppainen

Project manager

petri_jolma_sq

Petri Jolma

Project manager

Lead Magnet: The 101 of medical technology innovation
Download

Ask more about this project

Innokas highlights

Here you can find more of our latest news and insights in this category.

Innokas sustainability report launch

Read more

Introducing Valter Ritso, the new Director of Operations and Leadership team member at Innokas

Read more

Innokas Medical Rebrands as Innokas – Paving the Way for Growth and Innovation

Read more

Innokas highlights

Here you can find more of our latest news, tips and insights.

Getting the best return from prototyping

Read more

Efficient production transfer between factories

Read more

Why contract manufacturing?

Read more

How to find the elusive healthcare-certified software developer?

Read more

Innokas highlights

Here you can find more of our latest news and insights.

Case Terveystalo – Innokas software team helps develop medical software expertise

Read more

Case Nexstim – Familiarity with the sector and flexible operation gives a competitive edge

Read more

Case UKK Terveyspalvelut – Problem-solving skills and customer-oriented operation

Read more

Case MEGIN – Functional brain mapping by solutions based on magnetoencephalography technology

Read more

Innokas highlights

Here you can find more of our insights, news and tips.

No one builds alone – Contract manufacturing took the spotlight at Alihankinta subcontracting fair

Read more

Innokas challenges design thinkers to integrate circular design in healthcare

Read more

Arab Health 2024 – Our take and review

Read more

Innokas highlights

Here you can find more of our insights, news and tips.

Importance of hobbies in work-life balance – Insights from a Software Engineer

Read more

Europe's best – Innokas Medicals senior software engineer heading to Euroskills competition

Read more

Hire an International Student Campaign – Meet Ondra

Read more

Tomi Hugg is the new Director of Design Services at Innokas

Read more
Siberian husky sled running in a snowy environment. Innokas brand green glass theme. Background.

Let's get started!

Contact us and find out what we can do for you.

Contact us